
Builder in Woodburn
Builder in Woodburn for flood-resilient rebuilds, new homes and extensions on the Mid-Richmond floodplain. NSW Builder Licence 345758C.
- NSW Builder Licence 345758C
- ABN 58 940 419 109
- Booking 2026 projects
Riversedge Building Group works throughout Woodburn and the Mid-Richmond — Coraki, Broadwater and the surrounding floodplain villages. We handle new home builds, flood-resilient rebuilds, renovations, extensions and project management, with one licensed builder pricing and running the job.
Woodburn sits on the Richmond River inside the Mid-Richmond floodplain basin, where the natural constriction at Broadwater holds floodwaters across the flats between Broadwater, Woodburn and Coraki — and the town was severely affected by the 2022 flood. Here, flood-planning levels and resilient detailing drive the build. We confirm the flood-planning level for your block before design, and we work under NSW Builder Licence 345758C.
Richmond Valley Council planning for Woodburn
Residential work in Woodburn is assessed under the Richmond Valley Local Environmental Plan and Development Control Plan, with the Richmond River flood-planning level the central control. The mapping, informed by the Richmond Valley Flood Study, sets minimum habitable-floor heights that shape how a home is raised or rebuilt. We establish whether the work is Complying Development or needs a Development Application and read the flood mapping for the address before a contract is signed.
Rebuilding above the flood
On the Woodburn flats, a resilient home meets its flood-planning level and is detailed to recover. We set habitable floors above the mapped level, choose materials low in the structure that tolerate inundation, and keep electrical and key services above the flood line. The floor system — typically raised or suspended on this ground — is designed to the level mapped for your block, alongside the NCC and BASIX requirements that apply to every build.
Questions
- How high do I need to build in Woodburn?
- Minimum habitable-floor height is set by the Richmond River flood-planning level mapped for your block, not a single town-wide figure. On the Mid-Richmond flats this commonly means a raised or suspended floor. We confirm the level Richmond Valley Council holds for your address before design so the home is planned to it.
- Can you rebuild a flood-damaged Woodburn home to be more resilient?
- Yes. We design rebuilds to the current flood-planning level with resilient materials low in the structure and services kept above the flood line, so the new home recovers better than the old one. We confirm the mapping and approval pathway for your site early so the work is planned around it.
Woodburn and surrounds
Woodburn · NSW 2472
Richmond Valley
Woodburn lies on the Richmond River within Richmond Valley Council, inside the Mid-Richmond floodplain basin where the Broadwater constriction holds floodwaters between Broadwater, Woodburn and Coraki; the town was severely affected by the 2022 flood, so flood-planning levels and raised, resilient detailing govern rebuilds and new work.
Recent projects

Waterfront Entertaining Area

Open Plan Interior

Vaulted Entry
Our services
Nearby
- Byron Bay
- Ballina
- Lennox Head
- Kingscliff
- Tweed Heads
- Lismore
- Yamba
- Banora Point
- Pottsville
- Murwillumbah
- Cabarita Beach
- Casuarina
- Terranora
- Tweed Heads South
- Suffolk Park
- Bangalow
- Mullumbimby
- Brunswick Heads
- Ocean Shores
- New Brighton
- Alstonville
- Wollongbar
- Wardell
- Goonellabah
- Grafton
- Casino
- Evans Head
- South Grafton
- Junction Hill
- Iluka
- Coraki
- Kyogle
- Bilambil Heights
- Cudgen
- Billinudgel
- Federal
- Maclean
- East Ballina
- Hastings Point
- Kings Forest
- Ewingsdale
- Newrybar
Booking Woodburn projects for 2026
Talk to Riversedge Building Group about your project.
